HyperNews System of H1 New Release of OnLine Program for Luminosity_2000 subbranch Forum: Detector Components - Luminosity System Date: 2002, Jun 27 From: Alexandre Fomenko Just for information - new release of OnLine Program for Luminosity_2000 subbranch is operating with H1CDAQ starting from H1Run 313847 (27 June 2002 17:02). 3 updates are there: 1) as I hope it was found and removed the reason of "NoNewEvent" situation from 11th Branch traced to Luminosity_2000 subbranch; 2) new recommended values of offsets for PD and ET6 ADCs pipelines were set (my e-mail from Thu, 13 Jun 2002 14:01:01 to all Lumi experts) 29 = 0x1D for PD ADCs pipelines 36 = 0x24 for ET6 ADCs pipelines 3) Pedestals subtraction procedure was tuned. 5th (from 1-12) sampling is signal now and 8th(from 1-12) sampling is pedestal. Executable and script for program loading and running at FIC-board are kept at h1lumi.desy.de MacII (former aplumi03.desy.de) hard disc at directory: HD_LPI5/MPW/Release_2001/Centraldaq_2002_2706: TwinFIC1new.............MPST MPS .....59434 Thu, Jun 27, 04:53 PM 2002 Reboot_FIC1.............TEXT MPS .......655 Thu, Jun 27, 12:02 PM 2002 HyperNews System of H1 New Release of OnLine Program for Luminosity_2000 subbranch Forum: Detector Components - Luminosity System Date: 2002, Jul 10 From: Alexandre Fomenko Just for information - new release of OnLine Program for Luminosity_2000 subbranch is operating with H1CDAQ starting from H1Run 315080 (10 July 2002 11:35). It's test running - just to check the procedure of first KEEP BOS bank production from Lumi_2000 subbranch. Only one update is there: 1) Production of LUMM BOS-bank (KEEP bank) from "Lumi_2000" subbranch was introduced. Format of LUMM bank is another now as it was at "old" Lumi system. Data for LUMM BOS bank content (bunch rates, time stamp, InstLumi, SpLumi, Different Integrated Lumi Values) are prepared during ADC_Ramp/Lserver applications running at aplumi02-board. Executable and script for program loading and running at FIC-board are kept at h1lumi.desy.de MacII (former aplumi03.desy.de) hard disc at directory: HD_LPI5/MPW/Release_2001/Centraldaq_2002_0807: TwinFIC1new.............MPST MPS .....59678 Mon, Jul 08, 02:54 PM 2002 Reboot_FIC1.............TEXT MPS .......655 Thu, Jun 27, 12:02 PM 2002 Shortly about current format of LUMM bank. 1...220 PDRT()I -INF +INF ! Rate of Photon Detector Energy Trigger ! in bunch 0-219, in 0.1 Hz units ! (averaged over the last ~10 sec.) 221 PDRTTOT I 0 +INF ! Total Photon Detector Energy Trigger Rate ! in 0.1 Hz units ! (averaged over the last ~10 sec.) 222 LLTLUMM1 I -INF +INF ! TimeStamp1 - unix time at aplumi02 (sec tick) ! at Luminosity measurement moment 223 LLTLUMM2 I -INF +INF ! TimeStamp2 (nsec tick) ! at Luminosity measurement moment ! RealTime = TimeStamp1+0.000000001*TimeStamp2 224 InstLumi (10**25 cm-2s-1) 225 SpLumi (10**25 cm-2s-1mA-2) ----------- values accumulated for current H1Run ----------------------------- 226 RunGated (10**27 cm-2 = 1.0 mb-1) 227 DataTaken (10**27 cm-2 = 1.0 mb-1) ----------- values accumulated for current Lumi Fill ------------------------- 228 HERA_Produced_accumulated (10**27 cm-2 = 1.0 mb-1) 229 RunGated_accumulated (10**27 cm-2 = 1.0 mb-1) 230 DataTaken_accumulated (10**27 cm-2 = 1.0 mb-1) ----------- acceptance correction -------------------------------------------- 231 ACC (at 0.001 units) 0.975 now -> 975 ------------------------------------------------------------------------------ 232 - 239 Spare words Length of LUMM BOS bank now 241 words (239 + 2 words miniheader). Format is B32. HyperNews System of H1 New Release of OnLine Program for Luminosity_2000 subbranch Forum: Detector Components - Luminosity System Date: 2002, Jul 15 From: Alexandre Fomenko New release of OnLine Program for Luminosity_2000 subbranch is operating with H1CDAQ starting from H1Run 315603 (15 July 2002 10:18). Only one update is there: name of first KEEP BOS bank from Luminosity_2000 was changed from LUMM on LUMO. Format of BOS bank is the same as it was proclaimed at "New Release of OnLine Program for Luminosity_2000 subbranch" from Jul 10, 12:49 message. Executable and script for program loading and running at FIC-board are kept at h1lumi.desy.de MacII (former aplumi03.desy.de) hard disc at directory: HD_LPI5/MPW/Release_2001/Centraldaq_2002_0807: TwinFIC1new.............MPST MPS .....59678 Fri, Jul 12, 05:36 PM 2002 Reboot_FIC1.............TEXT MPS .......655 Thu, Jun 27, 12:02 PM 2002 HyperNews System of H1 New Release of OnLine Program for Luminosity_2000 subbranch Forum: Detector Components - Luminosity System Date: 2002, Aug 12 From: Alexandre Fomenko New release of OnLine Program for Luminosity_2000 subbranch is operating with H1CDAQ starting from H1Run 319413 (12 August 2002 15:44). Two updates are there: 1) new recommended values of offsets for PD and ET6 ADCs pipelines were set (my e-mail from Mon, 5 Aug 2002 16:34:41 to all Lumi experts) 31 = 0x1F for PD ADCs pipelines 38 = 0x26 for ET6 ADCs pipelines 2) Pedestals subtraction procedure was tuned for ET6 data. 6th (from 1-12) sampling is signal now and 9th(from 1-12) sampling is pedestal for ET6 data. Executable and script for program loading and running at FIC-board are kept at h1lumi.desy.de MacII (former aplumi03.desy.de) hard disc at directory: HD_LPI5/MPW/Release_2001/Centraldaq_2002_0807: TwinFIC1new.............MPST MPS .....59684 Mon, Aug 12, 03:32 PM 2002 Reboot_FIC1.............TEXT MPS .......709 Mon, Aug 12, 03:33 PM 2002 HyperNews System of H1 New Release of OnLine Program for Luminosity_2000 subbranch Forum: Detector Components - Luminosity System Date: 2002, Oct 23 From: Alexandre Fomenko Today 23.10.2002 at ~11:03 (Run 327771) new release of FIC's OnLine Program for Luminosity_2000 subbranch was tested. New release of OnLine Program for Luminosity_2000 subbranch is operating with H1CDAQ starting from H1Run 327771 (23 October 2002 11:03). Only one update is there: - five new KEEP BOS banks for H1 Data Flow are included (LPTA,LPLA,LPTB,LPLB & CJAC). First 4 BOS banks (LPTA,LPLA,LPTB & LPLB) - BOS banks with Polarization Data (both Transverse and Longitudial). Last - CJAC - BOS bank with CJC1,2 currents (180 values - at mkA units). citation from Run Summary for Run 327771: "... 434A4143:CJAC 28 92 92 92 4C504C41:LPLA 1 4 4 4 4C504C42:LPLB 1 222 222 222 4C505441:LPTA 1 13 13 13 4C505442:LPTB 1 222 222 222 ..." All new KEEP BOS banks have B16 format. Alan was informed about and made some modifictaion of Logging task application which became active starting from H1 Run 327751 23.10.2002 9:23 Executable and script for program loading and running at FIC-board are kept at h1lumi.desy.de MacII (former aplumi03.desy.de) hard disc at directory: HD_LPI5/MPW/Release_2001/Centraldaq_2002_2310: TwinFIC1new..........MPST MPS .....60974 Wed, Oct 23, 10:19 AM 2002 Reboot_FIC1..........TEXT MPS .......709 Mon, Aug 12, 03:33 PM 2002 DDL-descritions of BOS banks for polarization data were prepared by Nelly enough long time ago. Igor Sheviakov had made (09.10.2002) the delivery of polarization data from network to H1Lumi DPM with all needed for BOS bank structure data formating: "... *-- Author : Nelly Gogitidze 21/11/01 ! ! BANKname BANKtype !Comments ! TABLE LPLA B16 ! Polarization_Longitudinal_Averaged_data ! measurements and related info ! (non-event bank (KEEP-bank)) ! TABLE LPLB B16 ! Polarization_Longitudinal_singleBunch_data ! (non-event bank (KEEP-bank)) ! TABLE LPTA B16 ! Polarization_Transverse_Averaged_data ! measurements and related info ! (non-event bank (KEEP-bank)) ! TABLE LPTB B16 ! Polarization_Transverse_singleBunch_data ! (non-event bank (KEEP-bank)) ..." Messages Inline: Outline: 1. CJAC needed for each event by CJCREC by Claus Kleinwort, 2002, Oct 24 (_ New Release of OnLine Program for Luminosity_2000 subbranch by Alexandre Fomenko, 2002, Oct 24 (_ Problems with last release of FIC's H1Lumi OnLine program by Alexandre Fomenko, 2002, Oct 25 (_ New Release of OnLine Program for Luminosity_2000 subbranch by Alexandre Fomenko, 2002, Oct 27 HyperNews System of H1 New Release of OnLine Program for Luminosity_2000 subbranch Forum: Detector Components - Luminosity System Re: New Release of OnLine Program for Luminosity_2000 subbranch (Alexandre Fomenko) Re: CJAC needed for each event by CJCREC (Claus Kleinwort) Date: 2002, Oct 24 From: Alexandre Fomenko Today 24.10.2002 at ~11:23 (Run 327865) new release of FIC's OnLine Program for Luminosity_2000 subbranch was tested. New release of OnLine Program for Luminosity_2000 subbranch is operating with H1CDAQ starting from H1Run 327865 (24 October 2002 11:23). Only one update is there: - CJAC BOS bank is not KEEP BOS bank anymore and CJAC BOS bank is presented at each H1 event now - as Claus had requested. [frequency of CJAC BOS bank contents changing depends from changing of CJCs currents at network] citation from Run Summary for Run 327865: "... 434A4143:CJAC 200 92 92 92 <- each H1 event BOS bank [...] 434A4343:CJCC 200 34 34 34 <- each H1 event BOS bank (from Central Trig branch) 434A4B34:CJK4 200 2 2 2 <- each H1 event BOS bank (from Central Trig branch) [...] 4C4E4545:LNEE 200 13 13 13 <- each H1 event BOS bank 4C4E4546:LNEF 200 85 85 85 <- each H1 event BOS bank 4C4E5045:LNPE 200 25 25 25 <- each H1 event BOS bank 4C4E5046:LNPF 200 169 169 169 <- each H1 event BOS bank 4C4E504F:LNPO 2 9 9 9 <- RunStart/RunEnd Record BOS banks 4C4E5452:LNTR 2 40 40 40 <- RunStart/RunEnd Record BOS banks 4C504C41:LPLA 1 4 4 4 <- KEEP BOS bank 4C504C42:LPLB 1 222 222 222 <- KEEP BOS bank 4C505441:LPTA 1 13 13 13 <- KEEP BOS bank 4C505442:LPTB 1 222 222 222 <- KEEP BOS bank 4C554D4F:LUMO 10 241 241 241 <- KEEP BOS bank [...] 54535443:TSTC 227 10 10 10 <- each H1 event BOS bank [...] ..." Executable and script for program loading and running at FIC-board are kept at h1lumi.desy.de MacII (former aplumi03.desy.de) hard disc at directory: HD_LPI5/MPW/Release_2001/Centraldaq_2002_2310: TwinFIC1new..........MPST MPS .....60908 Thu, Oct 24, 11:11 AM 2002 Reboot_FIC1..........TEXT MPS .......709 Mon, Aug 12, 03:33 PM 2002 Messages Inline: Outline: 1. Problems with last release of FIC's H1Lumi OnLine program by Alexandre Fomenko, 2002, Oct 25 (_ New Release of OnLine Program for Luminosity_2000 subbranch by Alexandre Fomenko, 2002, Oct 27 HyperNews System of H1 New Release of OnLine Program for Luminosity_2000 subbranch Forum: Detector Components - Luminosity System Re: New Release of OnLine Program for Luminosity_2000 subbranch (Alexandre Fomenko) Re: CJAC needed for each event by CJCREC (Claus Kleinwort) Re: New Release of OnLine Program for Luminosity_2000 subbranch (Alexandre Fomenko) Re: Problems with last release of FIC's H1Lumi OnLine program (Alexandre Fomenko) Date: 2002, Oct 27 From: Alexandre Fomenko During last days I made some attempts to update FIC's OnLine Program for Luminosity_2000 subbranch with different ideas how to remove problem "BOS Error" which appears during high event rates at H1CDAQ. There is no final decision yet. Nevetheless the latest release of FIC's OnLine Program for Luminosity_2000 subbranch is operating now at H1CDAQ again starting from H1Run 328197. Let's see what will happen. The latest release of FIC's OnLine Program for Luminosity_2000 subbranch is kept at h1lumi.desy.de MacII (former aplumi03.desy.de) hard disc at directory: HD_LPI5/MPW/Release_2001/Centraldaq_2002_2310: TwinFIC1new.....MPST MPS .....60958 Sat, Oct 26, 08:04 PM 2002